High Expansion Zonal Abandonment Solution for Extended-Reach Horizontal Well in the Middle East

Case Study: An offshore operator in the Middle East required a tailored solution to shut-off an open-hole formation taking excessive fluid losses in an extended-reach horizontal well. Zonal abandonment was required to properly finalize drilling operations and commence completion activities in a safe and timely manner. IPI’s tailored solution for this challenge was an 8” OD Permanent Inflatable Bridge Plug configured as a Cement Retainer (PIBP-CR).

Download case study here

FOLLOW US